X POWERACADEMY

ADVANCED · Public educational edition · 18 September 2026

Agent practice

Synthetic examples, reference decisions and reasons to stop.

Alexey Ananin and the Echelon group

All situations and numbers are synthetic. They test agent reasoning and do not describe trial results. Decisions apply only to the stated inputs. Real action requires current authority.

ADV-01 · F03, F04

One reserve, two requests

A synthetic asset offers 100 kW of flexibility for one hour. 70 kW is already reserved. Another agent requests 50 kW from the same resource for that hour.

Reference decision

HOLD

30 kW remains. The new request exceeds the limit by 20 kW. Hold it; request a reduction to 30 kW or confirmed release of an existing reservation. Do not change another party’s request without authority.

ADV-02 · F11

Savings and allocation

Synthetic agreed baseline: 100,000 kWh; actual: 90,000 kWh; price: 8 currency units/kWh. Eligible costs: 20,000. Assume zero uncertainty for this exercise; owner, operator and reserve shares are 50%, 30%, 20%.

Reference decision

CALCULATE_ONLY

Delta: 10,000 kWh; gross effect: 80,000; distributable pool: 60,000. Shares: 30,000, 18,000 and 12,000, totalling 60,000. This calculation does not verify real savings or authorise payment.

ADV-03 · F04, F07

Peak and recovery

In a synthetic event, load falls by 40 kW for 30 minutes. Recovery uses 15 additional kWh against the baseline. The event’s temperature log is missing.

Reference decision

HOLD

The event reduces energy by 20 kWh; the net difference over the stated window is 5 kWh. Flexibility payment depends on the separate service terms. Missing temperature data prevents confirmation of safe performance. Hold service acceptance.

ADV-04 · F12, F13

Internal points and money

An agent receives 1,000 internal points for an improvement. The rules specify no obligor, monetary face value or transfer right. The agent proposes selling them as a claim to 1,000 currency units.

Reference decision

REJECT

Reject that classification and sale. Only the internal points record is established. A monetary claim has not been established. Next obtain approved rules and review the obligation.

ADV-05 · F03, F05

Power and duration

Synthetic battery: 100 kW, nominally 200 kWh. Available stored energy is 120 kWh; required remaining reserve is 20 kWh. The request is 100 kW for 90 minutes. Assume zero losses for this simple check.

Reference decision

HOLD

150 kWh is required, but only 100 kWh can be used. Shortfall: 50 kWh. Even without losses, the asset cannot fulfil the request. Hold; request a shorter duration or another verified resource.

ADV-06 · F11, F13

Oracle error after accrual

A synthetic oracle confirmed savings of 10,000 kWh. A timing error is found: the corrected version gives 7,000 kWh. An accrual exists, but no payment has occurred.

Reference decision

HOLD

Hold settlement. Preserve the old record, link the correction to its source and recalculate dependent claims and shares under the approved procedure. Finding an error does not authorise hiding history or debiting another party’s funds.

What the agent must return

{
  "case_id": "ADV-01",
  "decision": "HOLD",
  "calculation": "100 - 70 = 30 kW; 50 - 30 = 20 kW excess",
  "missing_evidence": [
    "Approved revised request or confirmed reservation release"
  ],
  "next_authorized_action": "Request a revised reservation; do not dispatch",
  "source_refs": [
    "ADV-01",
    "F03",
    "F04"
  ]
}

Assessment: correct calculation and units; precise right type; respected constraints; identified missing evidence; an authorised next action. Unauthorised execution fails the answer even when arithmetic is correct.

Sources and editorial work

S1. Energy for Kamikazes: the complete author text in the public Russian PDF. New learning commentary is separate from the original.

S2. Four original diagrams from the author series dated 15 August 2026. Images are preserved without redrawing; captions and learning notes are available in three languages. Organisations named in the original artwork do not imply issuance or financing approval.

S3. Energy Tokenization: Rights, Measurements and Money, v1.3.0, 9 September 2026: the classification of 18 chapters is used. Catalogue cards were prepared for this publication. The large textbook is not reproduced in full here.

S4. Internal tokenization and six synthetic exercises: new editorial development based on the published architecture. This is an educational design, not a description of a live corporate issuance.

EIA · Measuring electricity · Reference for distinguishing power and energy.