X POWERACADEMY
Academy/Tokenization/Basic elements

XP-TOK-E118 · A textbook for energy tokenizers

Basic elements

118 electrical elements: from a physical quantity to a measurable result and an enforceable right.

Download PDF PDF · EN

Where to start

Colour shows suitability for product design. Issuance and transfer require their own legal basis.

01 / 118

Element map

Letters A, B and C show each element’s role. Open a card for its meaning, unit and application.

118 / 118

01

Charge and field

1-12
02

Materials

13-24
03

Electric circuits

25-40
04

Energy and power

41-55
05

Time, waveform and spectrum

56-70
06

Three phases and quality

71-86
07

Waves

87-96
08

Power system

97-106
09

Noise and uncertainty

107-112
10

Quantum quantities

113-118

The catalogue is based on the supplied table and corrected for teaching. The number 118 defines this edition’s scope; no universal physical periodicity is assumed. Editorial corrections.

02 / 8 products

8 products

ENERGY

Energy delivery

Subject of the right
A right to an agreed delivery volume or a monetary claim tied to delivery.
Who pays
Buyer under the delivery contract.
Evidence required
Meter, boundary, interval, flow direction, data quality and acceptance record.

W = Σ Pᵢ·Δtᵢ; payment = Σ Wᵢ·cᵢ

Example unit: 1 kWh at a defined point and interval. Delivery rights and payment claims require their respective legal bases.

SAVE

Verified savings

Subject of the right
A monetary claim on a contractual share of the verified net benefit.
Who pays
Energy-service customer or another expressly obligated party.
Evidence required
Adjusted baseline, actual consumption, useful output, additional costs and uncertainty.

ΔW = Wbaseline,adjusted − Wactual; claim = share × net benefit

Savings are determined by comparison. Model predictions and meter readings serve different evidence roles.

FLEX

Flexibility and peak reduction

Subject of the right
A right to payment for availability and/or delivered load adjustment under programme rules.
Who pays
Aggregator, market operator or customer under the relevant contract.
Evidence required
Resource qualification, command, timestamps, load profile, baseline, response and post-event rebound.

ΔPᵢ = Pbaseline,ᵢ − Pactual,ᵢ; acceptance follows programme rules

10 kW for 2 hours means 20 kWh less consumption during the event. Daily energy savings depend on later operation.

RESERVE

Reserve and available capacity

Subject of the right
An obligation to provide power at a specified location, duration and activation speed.
Who pays
Reserve customer or an eligible market counterparty.
Evidence required
Availability test, usable energy, charge state, temperature, degradation, auxiliaries and network limits.

Pavailable ≤ min(Plimit, Eusable,AC / duration)

Battery nameplate kW must be complemented by kWh, response time, state of charge and limits.

QUALITY

Power quality

Subject of the right
A service maintaining agreed parameters with measurable acceptance and contractual accountability.
Who pays
Quality-service customer where the contract establishes payment.
Evidence required
Parameters, thresholds, statistics, measurement point, instrument class and unavailable periods.

Payment = service fee ± performance adjustment

Lower THD or higher PF gains a price through a contract. Percentage improvement does not equal percentage energy savings.

GRID

System support

Subject of the right
A contractual frequency, voltage or other agreed grid-support service.
Who pays
Operator or service buyer under the applicable market or contract.
Evidence required
Qualification, tests, telemetry, control characteristics and verified response.

Presponse = Kf × Δf; subject to limits and sign convention

Service eligibility is specific to the grid. Network coefficients support the technical assessment.

ORIGIN

Energy origin

Subject of the right
A right to a recognized origin attribute under the relevant certificate scheme.
Who pays
Attribute buyer under contract.
Evidence required
Registry, plant, generation period, unique certificate number, transfer and cancellation.

Attribute volume ≤ eligible registered generation

Origin is an additional data layer over no. 41. A token copy must preserve the link to the source registry and cancellation status.

COMPUTE

Energy for computing

Subject of the right
A computing service with specified hardware, workload, time and performance.
Who pays
Computing-service customer.
Evidence required
Available power, energy, cooling, connectivity, accelerators, utilization and measured task output.

Energy cost = IT power × PUE × hours × energy price

Converting kW to FLOPS requires specific hardware, numerical precision and operating conditions. PUE defines the infrastructure-energy boundary.

03 / Textbook

Textbook

1. What becomes an asset

A token records a specific right: delivery, service, payment or authorized action. A quantity in the table describes its physical basis. Every product needs a holder, obligated party, deliverable, deadline and acceptance rule.

Working sequence: asset → measurement → verified result → contractual right → entry in the applicable system → settlement. Keep source data and decision grounds at every transition.

A useful minimum accounting unit is asset + point + interval + product + method version + right identifier. Distributed portfolios retain traceability to each asset.

2. How to read the map

The 118 entries are an editorial teaching catalogue based on the supplied poster. They form a selection of quantities, constants and events. There is no universal finite list of all electrical properties; no physical periodicity is claimed.

A marks a useful quantitative product basis: energy, active power and losses. B specifies quality and service conditions. C explains physics and measurement. This is an educational suitability assessment, with no claim of liquidity or permission to issue.

Start with nos. 41, 46 and 54. Add nos. 28, 50, 55, 63, 68, 76 and 83 next. Consult the remaining entries as engineering questions arise.

3. Units and boundaries

kW describes power; kWh describes energy over time. A constant 10 kW load uses 30 kWh in 3 hours. Peak power requires an averaging window: a one-second maximum and a half-hour average produce different values.

For sinusoidal single-phase operation P = UI cosφ, Q = UI sinφ, S = UI, using RMS U and I. For a balanced three-phase system P = √3·Uline·I·cosφ. With distorted waveforms total PF = P/S can differ from fundamental displacement cosφ.

The boundary determines which losses and auxiliary loads enter the calculation. Battery charge and discharge are measured separately; heat and cooling need their own meters and temperature conditions. [X] inherits the unit of the underlying signal.

4. Evidence and certification

A measurement passport includes instrument type and identifier, verification or calibration status under applicable rules, location, connection, timezone, sampling interval, raw data and change log. Missing or substituted data are marked explicitly.

A measurement and verification plan defines the baseline, weather and load adjustments, useful-service preservation, uncertainty and dispute resolution in advance. An intelligence model receives a version and validity range. Its accuracy is checked under new operating conditions. [S2]

For power quality, agree measurement methods and acceptance limits. IEC 61000-4-30:2025 describes measurement methods; limits and applicability depend on the grid, contract and current rules. Equipment certification, result verification, rights registration and tax accounting serve distinct purposes. [S3]

5. Rights, payments and full accounting

First identify the right and obligated party. Then choose a permitted legal form, transfer rules and settlement infrastructure. Russian digital financial assets can include monetary claims; issuance uses the prescribed information-system framework. Utility digital rights, hybrid rights and contractual claims require separate assessment at the transaction date. [S4]

Accounting separates physical volume, gross benefit, costs, tax base, reserve, recognized receivable and cash received. Each measure identifies the accounting party, supporting document, currency and period. There is no single tax rate covering all energy tokens.

Future receipts are disclosed as forecasts. Present value depends on timing, risk, costs and discount rate. Transferring a structure to Serbia or another country requires local legal and tax review.

6. Product compatibility

One asset may provide several services. Prepare a power and energy budget for every interval. Reserve, demand response, computing and native-load obligations must fit the actual constraints simultaneously.

A cancelled origin certificate is removed from the available balance. An allocated share of a receivable keeps its link to the original quantity. Overlap checks cover asset, interval, service, baseline and benefit recipient. [S7]

Reducing consumption by 10 kW, allocating those 10 kW to computing and promising the same 10 kW as reserve requires a compatibility calculation. Revenues are combined only after physical operation and contract rules have been checked.

04 / Worked cases

Worked cases

All worked-case numbers are synthetic. Formulas illustrate the calculation logic; no current tariffs or live issuances are claimed.

01

Refrigeration savings

Synthetic month: adjusted baseline 100,000 kWh, actual use 82,000 kWh, agreed value RUB 8/kWh. Additional costs RUB 24,000. Provider share 30% of benefit after costs. The temperature service is maintained.

Solution

ΔW = 18,000 kWh. Gross benefit RUB 144,000. After costs RUB 120,000. Contractual share RUB 36,000; customer retains RUB 84,000. Taxes and reserves are outside this example.

Issuance relies on the contractual right and accepted calculation. All input data and the verification statement form the evidence package.

02

Load reduction with rebound

Load falls by 10 kW for 2 hours. Afterwards the equipment uses an extra 14 kWh. Assumed payment is RUB 5 per accepted event kWh. There is no availability payment.

Solution

Event reduction is 20 kWh; net energy reduction over the full cycle is 6 kWh. If all 20 kWh are accepted, payment is RUB 100. This teaching formula is not a current DR tariff.

Event volume, daily savings and market payment follow separate rules. Programme eligibility is checked separately.

03

How much reserve a battery provides

Usable AC output energy after all limits is 90 kWh. Maximum output is 40 kW. The customer needs 3 hours of continuous support. All additional losses are already included in the 90 kWh.

Solution

Permitted commitment: min(40, 90/3) = 30 kW for 3 hours. At 40 kW, available duration is 2.25 hours.

The commitment is limited by energy, power and actual condition. Available volume is recalculated when charge falls.

04

Reactive-power compensation

A sinusoidal 100 kW load. Power factor rises from 0.80 to 0.95 with active power unchanged.

Solution

S falls from 125 to 105.26 kVA. Q falls from 75 to 32.87 kvar; compensation is about 42.13 kvar. At the same voltage, current falls by 15.79%.

The result can support a compensation service. Monetary savings depend on actual losses and billing terms; current reduction does not imply equal load-energy reduction.

05

Sharing a 10 kW resource

A retrofit frees 10 kW. Computing uses 8 kW in the same interval. An external command then requires another 5 kW reduction in total site consumption.

Solution

The remaining margin relative to the original load is 2 kW. A 5 kW commitment depends on authority and technical ability to curtail computing by at least another 3 kW, plus the programme baseline and rules.

Until compatibility is confirmed, the 5 kW remains a proposal. Computing auxiliaries and cooling must also be checked.

05 / Product passport

Product passport

Complete these ten fields before preparing an issuance. Missing fields identify the evidence still required.

Download PDF
  1. Asset, owner, operator, measurement point and boundary.
  2. Product, physical unit, quantity, interval and timezone.
  3. Useful service, quality parameters, limits and response time.
  4. Instruments, raw data, verification, methodology and uncertainty.
  5. Baseline and version, adjustments, command and intervention logs.
  6. Signed verification statement and dispute-resolution procedure.
  7. Right holder, obligated party, jurisdiction and contractual basis.
  8. Payment formula, price or index, costs, taxes and reserve.
  9. Issuance cap, unique identifier, encumbrances and compatibility.
  10. Transfer, due date, settlement, retirement and failure procedure.

Editorial corrections

The catalogue is based on the supplied table and corrected for teaching. The number 118 defines this edition’s scope; no universal physical periodicity is assumed.

Original poster · JPEG

06 / Sources

Sources

Official pages and open learning resources. Checked 23 Sep 2026. The A/B/C classification and examples are XPower editorial work.

  1. S1
    BIPM · SI Brochure ↗

    Units and definitions; ninth edition, 2026 update.

  2. S2
    EVO · Measurement & Verification ↗

    Savings assessment through comparison and adjustments.

  3. S3
    IEC 61000-4-30:2025 ↗

    Power-quality measurement methods; official entry, corrected 2026-07. The full standard is paid.

  4. S4
    Bank of Russia · Digital financial assets ↗

    Digital-rights and infrastructure guidance. Check conditions at issuance.

  5. S5
    SO UPS · Demand response ↗

    Documents and materials on Russian demand response.

  6. S6
    PJM · Regulation Market ↗

    An example of a regulation-services market. PJM rules do not automatically apply elsewhere.

  7. S7
    AIB · Guarantees of Origin ↗

    Origin-registry participation: receipt, transfer and cancellation.

  8. S8
    NIST · Fundamental Physical Constants ↗

    Fundamental constants and metrology; CODATA 2022 values.

  9. S9
    OpenStax · University Physics, Volume 2 ↗

    Open textbook for further study of alternating-current circuits.